Insulation Resistance or IR Test is carried out by maintenance engineers to ensure the healthiness of the overall insulation system of electrical equipment.
It reflects the presence or absence of harmful contamination, dirt, moisture, and gross degradation.
IR value will be usually high (several hundred Megaohms) for a dry insulation system. Maintenance engineers use this parameter as an index of dryness of the insulation system.
The test measurement values are affected by variables such as temperature, humidity, test voltage, and size of the transformer.
This test should be conducted before and after repair or when maintenance is performed. The test data should be recorded for future comparative purposes. The test values should be normalized to 20°C for comparison purposes.
Insulation resistance test is conducted in most of the substation equipment is high and medium voltage substations.
Recommended Minimum Insulation Resistance for Transformer Winding
Rated Voltage ( kV) | IR value in MΩ | |||
30°C | 40°C | 50°C | 60°C | |
66 and above | 600 | 300 | 150 | 75 |
33 | 500 | 250 | 125 | 65 |
11 & 6.6 | 400 | 200 | 100 | 50 |
Below 6.6 | 200 | 100 | 50 | 25 |
Note: As a rough guide, the Megger values should be 2 meg. Ohms for every rating at 60°C for 11 KV and above. The Megger values double itself for every 10°C fall in temperature. |
The procedure of IR Test:
- First, disconnect all the line and neutral terminals of the transformer.
- Megger leads to be connected to LV and HV bushing studs to measure Insulation Resistance IR value in between the LV and HV windings.
- Megger leads to be connected to HV bushing studs and transformer tank earth point to measure Insulation Resistance IR value in between the HV windings and earth.
- Megger leads to be connected to LV bushing studs and transformer tank earth point to measure Insulation Resistance IR value in between the LV windings and earth.
Insulation Resistance values are taken between the windings collectively as because all the windings on the HV side are internally connected together to form either star or delta. Also, all the windings on the LV side are internally connected together to form either star or delta.
Related: Tests and Tag Courses
Measurements are to be taken as follows :
- For Auto-transformer
- HV-IV to LV,
- HV-IV to E,
- LV to E
- For Two winding transformer
- HV to LV,
- HV to E,
- LV to E
- For Three winding transformer
- HV to IV,
- HV to LV,
- IV to LV,
- HV to E,
- IV to E,
- LV to E
Comments are closed.